Treating the stage plan as the whole plan
The most common mistake starts well before load-in: a stage plan arrives, everyone nods, and nobody asks who is responsible for the spaces between the stage and the truck. Cable routes, camera positions in the audience, the corner where the vision mixer sits and the path the runner takes to reach it are rarely drawn. On the day, each of those gaps becomes a quick decision made by whoever is nearest, and quick decisions pile up.
I have lit enough festival stages to know that the plan on paper is only the first layer. Ask for a site walk, or at least a marked-up ground plan, that shows power, cable runs, crew routes and where the audience will stand. If a camera platform is not on that drawing, it is not yet agreed, and it should be treated that way.
- Mark cable routes and crew walkways on the ground plan
- Name an owner for every position that is not on stage
- Agree where spare cable and tape are kept
Leaving talkback to the last hour
Talkback is often set up after cameras and sound, when everyone is tired and the doors are close to opening. It is then tested with a single word into a single headset, and declared fine. The trouble comes at the first cue, when the stage manager cannot reach the gallery, or a camera operator hears the wrong channel and acts on a cue meant for someone else.
Build the talkback list early, as a short document: who is on which channel, who can speak to whom, and what happens if a belt pack fails. Test every position, including the ones nobody expects to need, such as the front of house desk and the lighting operator. A five-minute round of names, read aloud, finds most faults.
- Write a channel list and share it before load-in
- Test every headset, not just the main ones
- Keep two spare belt packs charged and labelled
Lighting for the room instead of the lens
A stage that looks wonderful to the people standing in front of it can look flat, harsh or muddy once it goes through a camera. Strong backlight, saturated colours on faces and fast chases all behave differently on screen. The mistake is to light the show for the audience and then ask the camera team to cope with the result.
Where a broadcast or recording is part of the event, agree a camera-friendly state for the key moments, and rehearse with the cameras running, not only with the eye. Keep a simple fallback look that works for speech and applause. Crews can reset a plain rig quickly, and the pictures tend to be the better for it when time runs short.
- Check key looks on a monitor, not only from the floor
- Set one safe, even look for speeches and thanks
- Avoid changing the rig once rehearsals have started
Skipping the handover between shifts
Live events run long, and crews change. A morning team rigs, an afternoon team rehearses, an evening team runs the show. The mistake is assuming that the knowledge in the first group's heads will reach the third. Settings get nudged, a mic is swapped, a cue is moved, and the next person finds out when something fails in front of the audience.
A one-page handover is enough: what has changed since the plan, what is not working, what is borrowed and from whom, and who to ask. Hand it over in person, at the position, not by message. It takes ten minutes and saves the sort of mystery that eats an hour at the worst possible moment.
- Keep a running change log at each position
- Hand over in person, standing at the desk or rig
- Record borrowed or temporary kit by name
Underestimating weather and the autumn working day
In these weeks the light goes early, the ground is damp and cold hands slow everything down. Outdoor stages and temporary studios get caught out: cables lie in standing water, lenses mist, and a crew that planned for a long afternoon finds itself rigging in the dark. Plans written in summer rarely allow for any of this.
Build the schedule backwards from the time the audience arrives, and add margin for rigging in poor light. Cover connectors, raise cable runs where water collects, and keep dry clothing and warm drinks for the crew, which is a practical matter rather than a kindness. A tired, cold operator makes more errors, and the show feels them.
- Raise or cover connectors where the ground is wet
- Add rigging time for early darkness
- Keep lens cloths and covers at every camera
Running without a clear person in charge on the floor
The last mistake is the quietest. With many departments present, each assumes another is watching the whole. Sound solves its own problems, lighting solves its own, cameras do the same, and nobody sees the pattern forming. A late artist, a delayed set change and a faulty monitor then land together, with no single person making the call.
Name one floor lead before the day begins, and make sure every department knows who it is and how to reach them. That person does not need to be the most senior; they need to be calm, visible and willing to decide. Where we provide on-site coordination, this is the role we protect most carefully, because a clear voice keeps small faults small.
- Announce the floor lead at the first briefing
- Give them a direct talkback channel
- Agree in advance who can stop the show, and when
None of these mistakes needs special equipment to fix. They come down to drawing the whole site, testing every position, lighting for the lens, handing work over properly, respecting the season and naming one person on the floor. Do those six things and most event days settle into a calm rhythm, with the crew free to concentrate on the cue in front of them.